CJ
Central Java MW Coal Fired Power Plant Project, North Coast of Java, Indonesia
Description
Central Java Power Project (Jawa Tengah), also known as PLTU Batang or Batang power station, is a proposed 1,900-megawatt (MW) coal-fired power station by PT Bhimasena Power Indonesia (BPI). The project is planned for Pemalang, Batang, in Central Java, Indonesia. In 2015 the cost was estimated at US$4 billion. Unit 1 is now planned for commissioning in 2018, and Unit 2 in 2019.
Owner/ EPC Company/ Purchaser
PT.BHIMASENA POWER INDONESIA / Black & Veatch Corporation / B&V, HAMON, HUADIAN, YUANDA, SUNRUI etc.
Our Scope
Cable and Accessories / Conduit and Fittings / Raceway Supports / Lighting Fixtures / Panelboards / etc.

TJB
Tanjung Jati B 2*1000 coal-fired power plant Units 5 & 6 Expansion Project, Indonesia
Description
Tanjung Jati B power station (also known as Jawa-4) is a 2,640 megawatt (MW) coal-fired power station in Central Java Province, Indonesia. An additional 2 x 1070 MW is under development.Unit 3 was commissioned in November 2011 and Unit 4 was commissioned in January 2012. The units cost $2.1 billion. Our company participated in the supply of line transmission systems and lightning protection grounding systems in this Project.
Owner/ EPC Company/ Purchaser
PT.Bhumi Jati Power / Black & Veatch Corporation / B&V, HAMON, HUADIAN, etc.
Our Scope
Cable and Accessories / Conduit and Fittings / Raceway Supports / Grounding and Lightning / Panelboards / etc.

Lontar
Lontar Extension 1*315MW Coal Fired Steam Power Plant, Indonesia
Description
State electricity company PT PLN has signed engineering, procurement and construction (EPC) contract with Japan’s Sumitomo Corporation on Friday (Sept. 18) to carry out coal-fired power plant (PLTU) Lontar expansion project with capacity of 1Å~315 MW. The project is part of the government’s 35,000 MW ambitious power plant program. The power plant will be built on 11 hectares of land, within the location of PLTU 3 Banten-Lontar, in Tangerang, Banten province.
Owner/ EPC Company/ Purchaser
PT. PERUSAHAAN LISTRIK NEGARA / Black & Veatch Corporation / B&V
Our Scope
Cable and Accessories / Conduit and Fittings / Raceway Supports / Lighting Fixtures / Panelboards / Workshop / etc.

Hassyan
Dubai Hassyan 4*600MW Clean Coal Power Project, UAE
Description
The project was designed to meet the increasing demand for power and water in Dubai, and will be carried out in six phases. Each phase will include the construction of a power island with a capacity of 1,500MW and a desalination island with a capacity of 120 MIGD. The cost of each phase is estimated to be between $2bn and $3bn.The first power station P1 will be operational in 2014 and the remaining five will Follow.
Owner/ EPC Company/ Purchaser
Dubai Electricity and Water Authority (DEWA) / ACWA Power and Harbin Electric International Company / HEI
Our Scope
Accessories

EG2
Ethylene Glycol Production Facility, Point Comfort, Houston, Texas
Description
Formosa Petrochemical Corp. (FPCC), a member of the Formosa Plastics Group (FPG), plans to build the complex in two phases over 10 years. During the first phase, the company will build a 1.2 million metric tons per year (MMt/y) ethylene plant and downstream facilities for the production of polyethylene (PE) and ethylene glycol (EG), as well as propylene and polypropylene (PP). The second phase will include an additional ethyene plant, as well as PE and EG plants.
Owner / EPC Company / Purchaser
Formosa Plastics Group (FPG) / Formosa Petrochemical Corp (FPCC) / Formosa Plastics Corp. USA / FG LA, / Wilson Engineering Ltd.
Our Scope
Cables / Conduits / Conduit Fittings / Grounding Materials

Red Line
Mass Transit System, Tel Aviv, Israel
Description
The Red Line is the first section of a Light Rail System in the Tel Aviv metropolitan area, known as Tel Aviv Light Rail. The Red Line will run from Bat Yam in the south to Petah Tikva in the northeast via Tel Aviv, Ramat Gan and Bnei Brak, with a branch line to Kiryat Aryeh and the Depot.
On March 21, 2018, the EPC contract was awarded to the CRTG-EEB Red Line System L.P., jointly founded by the China Railway Tunnel Group Co., Ltd (CRTG) and the China Railway Electrification Bureau Group (EEB).
Galaxy (PA) has been vetted as an approved supplier by CRTG-EEB RED LINE SYSTEM L.P. and has signed the contract of cabling system part in April 2019.
Owner / EPC Company / Purchaser
National Transit Authority (NTA) / Metropolitan Mass Transity System Ltd. / CRTG-EEB Red Line System LP
Our Scope
Cabling System